Prestige Raintree Park | Apartments |
---|
Prēstigē Codename Raintree Park is a premier residential community that embodies elegance, luxury, and serenity. Situated in the bustling neighborhood of Whitefield, this expansive project offers a harmonious blend of modern living and natural surroundings, providing residents with an unmatched quality of life. Spanning acres of verdant landscapes the development presents needs at your doorstep. As you enter Raintree Park Whitefield Bangalore , you are greeted by a grand entrance that exudes sophistication. The sprawling green spaces, meticulously manicured gardens, and tree-lined boulevards create a serene ambiance that instantly transports you away from the hustle and bustle of city life. The architecture seamlessly blends contemporary design with elements of nature, creating a harmonious environment that inspires a sense of tranquility.
Unit Type | Saleable Area | RERA Carpet Area | Price |
---|---|---|---|
3 BHK | 2000Sqft | 2000Sqft | N/A |
3 BHK | 2200Sqft | 2200Sqft | N/A |
3.5BHK | 2400Sqft | 2400Sqft | N/A |
4 BHK | 2900Sqft | 2900Sqft | N/A |
5 BHK | 3700Sqft | 3700Sqft | N/A |
ATM
Electricity
Garden
Gym
Lift
Parking
Play Ground
Security
Water
RCC Structure.
Cement blocks/ precast hollow core panels for walls.
Vitrified tiles in the foyer, living, dining, corridors, and all bedrooms.
Ceramic tiles on the balcony, kitchen, Utility, maid’s room, and maid’s toilet.
Main Door – Timber frames and Flush shutters.
Internal doors – Timber frames and laminated flush shutters.
UPVC/ Aluminium framed windows with clear glass.
All toilets with countertop washbasins.
Master Toilet with shower partition and glass door, all other toilets with shower partitions.
Wall Hung EWCs in all toilets Except Maid’s Toilet.
Sanitaryware and CP Fittings of reputed make.
Lifts of suitable size and capacity will be provided in all towers.
Round-the-clock security with intercom facility.
CCTV Cameras at all vantage points.
A 3-phase Power supply from BESCOM with ELCB and individual meters will be provided for all apartments.
All electrical wiring is concealed in PVC-insulated copper wire with modular switches.
DG POWER – 100% Backup for all apartments at additional cost.
Prestige Group
The Prestige Group owes its origin to Mr. Razack Sattar, who envisioned a success story waiting to take shape in the retail business in 1956 itself. Prestige Estates and Properties was set up in 1986 growing swiftly to become the leading property developers in Bangalore.
Prestige Court on K.H. Road in Bangalore set the pace, and with over 190 developments covering 38.5 million sq ft of developable area to its credit, Prestige constructions now house a very large populace residing in South India.
Also, Prestige hosts some of the biggest MNCs in business here with residential, commercial, retail, and hospitality developments on the cards approximating 61.4 million sq. ft. just in the area.
A presence in the retail sector with Prestige Tech Cloud Park, multiplexes, and malls, Prestige has built for itself a name in property development.